[ USACE [ Up to Publications [ Bottom of Page ]  [ Search ]  [ Help, POC List
colored horizontal rule

Civil Works
Engineer Regulations

PUB.NUMBER PAGES CD ROM PROPONENT TITLE PUB.DATE
ER 1-2-2 003 CECW-PL Water Resources Policies and Authorities Substantive Congressional Contacts (RCS: CECW-P-21) 01 Jul 91
ER 5-1-10 003 CEMP-MP/CECW-EP Corps-wide Area of Work Responsibility 30 Sep 97
ER 11-1-320 34 CECW-OE Civil Works Emergency Management Programs 1 Oct 98
ER 11-1-321 28 CECW-OE Army Programs - Value Engineering 28 Feb 05
ER 11-2-101 281 CECW-B Army Programs - Civil Works Activities CH 1-24 01 Aug 64
ER 11-2-201 017 CECW-B Civil Works Activities - Funding, Work Allowances, and Reprogramming (RCS: CECW-B-11) 31 Aug 95
ER 11-2-220 043 CECW-B Civil Works Activities General Investigation (RCS: DAEN-CWB-12) 29 Jul 77
ER 11-2-240 019 CECW-B Civil Works Activities - Construction & Design (RCS: DAEN-CWB-20), ENG Form 2200, ENG Form 2201A, ENG Form 2204-R, ENG Form 2205A 06 Aug 96
ER 11-2-290 005 CECW-BA Civil Works Activities, General Expenses (RCS: DAEN-CWB-20) 31 Jul 86
ER 15-1-36 004 CEMP-EC/CECW-LC Committee on Cost Engineering 15 Oct 91
ER 15-1-41 005CECE-E/CEMP-E Corps of Engineers Specifications Steering Committee (CSSC) 24 Dec 98
ER 15-1-43 002CECW-E United States Army Corps of Engineers Acquisition Corporate Group 28 Feb 03
ER 15-2-2 005 CECW-M Foreign-Trade Zones - Establishment, Operation Maintenance and Administration 30 Jul 82
ER 15-2-13 002 CECW-EH Mississippi River Water Control Management Board 10 May 89
ER 15-2-14 008 CECW-EH-D Committees on Tidal Hydraulics, Channel Stabilization, Water Quality and Hydrology 24 Apr 92
ER 25-2-1 016 CECW-BD Annual Report of the Secretary of the Army on Civil Works Activities (RCS: CONG-1006) 30 Sep 97
ER 37-2-18 001 CECW-EH Collection of Project Funds for Operation of Hydrologic Programs 29 Oct 99
ER 70-2-5 002 CECW-PF Remote Sensing Coordinators' Responsibilities 03 May 74
ER 140-1-2 003 CECW-OE U.S. Army Corps of Engineers Individual Mobilization Augmentee (IMA) Program 01 Sep 91
ER 200-1-4 095 CECW-B Environmental Compliance Policies-Formerly Utilized Sites Remedial Action Program (FUSRAP) - Site Designation, Remediation Scope, and Recovering Costs 30 Aug 03
ER 200-1-5 086 CEMP-R, CECW-P Policy for Implementation and Integrated Application of the U.S. Army Corps of Engineers (USACE) Environmental Operating Principles (EOP) and Doctrine 30 Oct 03
ER 200-2-2 019 CECW-PO Procedures for Implementing NEPA 04 Mar 88
ER 200-2-3 040 CECW-ON Environmental Compliance Policies 30 Oct 96
ER 350-1-419 002 CECW-P Performance Evaluation - Planners and Project Managers Program - Water Resouces Support Center 30 Oct 92
ER 360-2-25 001 CECW-OC Proposed Advertising Schedule of Civil Works Contracts 20 Apr 82
ER 415-2-100 005 CECW-OC Staffing for Civil Works Projects 15 Jan 93
ER 500-1-1 110 CECW-OE Emergency Employment of Army and Other Resources
Civil Emergency Management Program
30 Sep 01
ER 500-1-2 023 CECW-OE-P Corps of Engineers Mobilization and Operations Planning & Execution System (CEMOPES) Theater of Operations (TO) 30 Oct 95
ER 500-1-18 050 CECW-OE-P Corps of Engineers Continuity of Operations Planning System (CECOPS) 30 Mar 85
ER 500-1-20 007 CECW-OE-D USACE R&D and Other Separate FOA Support to Preparedness, Response and Recovery for Emergencies and Disasters 15 Oct 85
ER 500-1-28 025 CECW-OE Response Planning Guide (Emergency Employment) 01 Jun 95
ER 690-1-1212 004 CEHR-E
CECW-E
CEMP-ZB
Civilian Personnel - Professional Registration as a Selective Placement Factor 31 Mar 04
ER 715-1-21 009 CECW Procurement - Electronic Contract Solicitations 01 Oct 03
ER 1105-2-100
Amendment #1, Appendix G
652 CECW-P Planing Guidance Notebook 22 Apr 00

30 Jun 04

ER 1105-2-101 012 CECW-PD Risk-Based Analysis for Evaluation of Hydrology/Hydraulics, Geotechnical Stability, and Economics in Flood Damage Reduction Studies 1 Mar 96
ER 1110-1-5 010 CECW-EG Plant Pest Quarantined Areas and Foreign Soil Samples, ENG Form 1743, ENG Form 1743A 25 Jul 84
ER 1110-1-12 053 CEMP-S/
CECW-EP
Quality Management 01 Jun 93
ER 1110-1-260 002 CEMP/CECW Fire Protection Engineering Policy 28 Apr 95
ER 1110-1-261 005 CECW-EG/
CECW-EH/
CEMP-EC
Quality Assurance of Laboratory Testing Procedures 28 Apr 99
(original)
15 Jun 99
(errata #1)
ER 1110-1-1001 002 CECW-EP Standard Survey Disc 01 Feb 92
ER 1110-1-1300 015 CEMP-EC Cost Engineering Policy and General Requirements 26 Mar 93
ER 1110-1-1401 006 CECW-EH-W Interlaboratory Testing Program for Chemical Analyses 15 May 89
ER 1110-1-1807 006 CECW-EG Procedures for Drilling in Earth Embankments 30 Sep 97
ER 1110-1-1901 021 CECW-EG Project Geotechnical and Concrete Materials Completion Report for Major USACE Projects 22 Feb 99
ER 1110-1-2002 015 CECW-EG Cement, Slag, and Pozzolan Acceptance Testing 30 Sep 98
ER 1110-1-2005 006 CECW-EG Compilation of Concrete Aggregate and Stone Riprap Test Data 1 Jan 99
ER 1110-1-8100 013 CERD-C/
CECW-EG/
CEMP-RT
Laboratory Investigations and Testing 31 Dec 97
ER 1110-1-8155 10CECW-E Specifications 10 Oct 03
ER 1110-1-8156 7 CECW-EP-S Policies, Guidance, and Requirements for Geospatial Data and Systems 01 Aug 96
ER 1110-1-8157 34 CECW-ET Geotechnical Data Quality Management for Hazardous Waste Remedial Activities 01 Oct 02
ER 1110-1-8158 18 CECW-EP/CEMP-ET Corps-Wide Centers of Expertise Program 16 Jan 98
ER 1110-1-8159 002 CECW-ETE Engineering and Design, DrChecks 10 May 2001
ER 1110-2-1 003 CECW-EG Provisions for Future Hydropower Installation at Corps of Engineers Projects 29 Jan 82
ER 1110-2-50 002 CECW-EH-D Low Level Discharge Facilities for Drawdown of Impoundments 22 Aug 75
ER 1110-2-100 015 CECW-EG Periodic Inspection and Continuing Evaluation of Completed Civil Works Structures 15 Feb 95
ER 1110-2-101 003 CECW-E Reporting of Evidence of Distress of Civil Works Structures 15 Mar 96
ER 1110-2-103 010 CECW-EG Strong Motion Instrument for Recording Earthquake Motions on Dams 10 Dec 81
ER 1110-2-109 018 CECW-E Hydroelectric Design Center 01 Nov 01
ER 1110-2-110 003 CECW-EG Instrumentation for Safety - Evaluations of Civil Works Projects 08 Jul 85
ER 1110-2-111 034 CECW-EI/CECW-OD Periodic Safety Inspection and Continuing Evaluation of USACE Bridges 31 Aug 02
ER 1110-2-112 002 CECW-EG Required Visits to the Construction Sites by Design Personnel 15 Apr 92
ER 1110-2-240 055 CECW-EH-W Water Control Management (Ch 1, 30 Apr 87/Ch 2, 1 Mar 94) 08 Oct 82
ER 1110-2-241 018 CECW-EH-W Use of Storage Allocated for Flood Control and Navigation at Non-Corps Projects 24 May 90
ER 1110-2-248 006 CECW-EH-W Requirements for Water Data Transmission Using GOES/DCS 13 Mar 81
ER 1110-2-249 009 CECW-EH-W Management of Water Control Data Systems 31 Aug 94
ER 1110-2-401 004 CECW-EH-D Operation, Maintenance, Repair, Replacement, and Rehabilitation Manual for Projects and Separable Elements Managed by Project Sponsors 30 Sep 94
ER 1110-2-1150 064 CECW-EP Engineering and Design for Civil Works Projects 31 Aug 99
ER 1110-2-1155 028 CECW-EP Dam Safety Assurance Program 12 Sep 97
ER 1110-2-1156 004 CECW-E Dam Safety - Organization, Responsibilities, and Activities 31 Jul 92
ER 1110-2-1200 011 CECW-EP Plans and Specifications for Civil Works Projects 30 Oct 93
ER 1110-2-1302 058 CECW-EC Civil Works Cost Engineering, ENG 1738-R, ENG 1739-R, ENG 1740-R, ENG 1741-R , ENG 1741A-R, ENG 1741B, ENG 1741C-R 31 Mar 94
ER 1110-2-1400 004 CECW-EH-W Reservoir/Water Control Centers 30 Sep 93
ER 1110-2-1403 009 CECW-EH/CERD-C Studies by Coastal, Hydraulic and Hydrologic Facilities and Others 01 Jan 98
ER 1110-2-1404 004 CECW-EH-D Hydraulic Design of Deep-Draft Navigation Projects 31 Jan 96
ER 1110-2-1405 008 CECW-EH-D Hydraulic Design for Local Flood Protection Projects 30 Sep 82
ER 1110-2-1406 005 CECW-EH-D Coastal Field Data Collection 30 Apr 90
ER 1110-2-1407 009 CECW-EH Hydraulic Design for Coastal Shore Protection Projects 30 Nov 97
ER 1110-2-1450 007 CECW-EH-Y Hydrologic Frequency Estimates 31 Aug 94
ER 1110-2-1451 004 CECW-EH Acquisition of Lands Downstream from Spillways for Hydrologic Safety Purposes 10 Aug 78
ER 1110-2-1453 002 CECW-EH Criteria for SPH and PMH Wind Fields 20 Mar 81
ER 1110-2-1454 021 CECW-EH Corps Responsibilities for Non-Federal Hydroelectric Power Development under the Federal Power Act 15 Jul 83
ER 1110-2-1455 013 CECW-EH-W Cooperative Stream Gaging Program (RCS: DAEN-CWH-3) 29 Jan 84
ER 1110-2-1457 012 CECW-EH-D Hydraulic Design of Small Boat Navigation 24 Jun 85
ER 1110-2-1458 007 CECW-EH Hydraulic Design of Shallow Draft Navigation Projects 30 Apr 98
ER 1110-2-1460 012 CECW-EH-Y Hydrologic Engineering Management 07 Jul 89
ER 1110-2-1462 008 CECW-EH-W Water Quality and Water Control Considerations for Non-Federal Hydropower Development at Corps of Engineers Projects 20 Feb 91
ER 1110-2-1463 004 CECW-EH Hydrologic Engineering for Hydropower 30 May 92
ER 1110-2-1464 006 CECW-EH-Y Hydrologic Analysis of Watershed Runoff 30 Jun 94
ER 1110-2-1802 005 CECW-EG Reporting Earthquake Effects 25 Jul 79
ER 1110-2-1806 025 CECW-ED/EG Earthquake Design & Evaluation of Civil Works Projects 31 Jul 95
ER 1110-2-1925 002 CECW-EG Field Control Data for Earth and Rockfill Dams (RCS: ENG CW-E-11 (R1) CH 1-2 03 Jul 69
ER 1110-2-1941 004 CECW-EH-W Drought Contingency Plans 15 Sep 81
ER 1110-2-1942 006 CECW-EG Inspection, Monitoring and Maintenance of Relief Wells 25 Sep 98
ER 1110-2-2902 008 CECW-EH-D Prescribed Procedures for the Maintenance and Operation of Shore Protection Works 30 Jun 89
ER 1110-2-4001 005 CECW-EH-W Notes on Sedimentation Activities (RCS: DAEN-CWE-12) 12 Nov 81
ER 1110-2-4401 003 CECW-EE Clearances for Power & Communication Lines over Reservoirs 30 May 97
ER 1110-2-8151 005 CECW-EH Monitoring Completed Navigation Projects 31 Jul 97
ER 1110-2-8152 005 CECW-ED Planning and Design of Temporary Coffer Dams and Braced Excavation 31 Aug 94
ER 1110-2-8153 006 CECW-EH Technical Project Sedimentation Investigations 30 Sep 95
ER 1110-2-8154 008 CECW-EH-W Water Quality and Environmental Management for Corps Civil Works Projects (RCS: DAEN-CWH-4) 31 May 95
ER 1110-2-8155 12 CECW-EH Hydrometeorological Data Management and Archiving 31 Jul 96
ER 1110-2-8156 064 CECW-EH-W Preparation of Water Control Manuals 31 Aug 95
ER 1110-2-8157 007CECW-ED Responsibility for Hydraulic Steel Structures 31 Jan 97
ER 1110-2-8159 004 CECW-ED Life Cycle Design and Performance 31 Oct 97
ER 1110-3-107 001 CECW-EG Design of Military Airfield Pavements 29 Jan 88
ER 1110-3-108 001 CECW-EG Evaluation of Military Airfield Pavements 29 Jan 88
ER 1110-8-2(FR) 009 CECW-EH-Y Inflow Design Floods for Dams and Reservoirs 01 Mar 91
ER 1125-2-307
Change 1
008 CECW-O Subsistence - Quarters & Allowance 31 Dec 87
31 Dec 96 (change 1)
ER 1130-2-314 030 CECW-OM Nondiscrimination of Federally Assisted Programs 26 May 67
ER 1130-2-337 037 CECW-OM Assignment of Operation and Maintenance Expenses to Proper Cost Accounts for Multiple-Purpose Projects with Power 15 Jul 69
ER 1130-2-406 022 CECW-ON Shoreline Management at Civil Works Projects 31 Oct 90
(original)
28 May 99
(change 2)
ER 1130-2-445 013 CECW-EP Civil Works Digital Projects Notebook 31 Mar 00
ER 1130-2-500
Change 1
Change 2
060 CECW-O Partners and Support (Work Management Policies) 27 Dec 96
17 Oct 97(change 1)
30 Sep 03(change 2)
ER 1130-2-510 015 CECW-OM Hydroelectric Power Operations and Maintenance Policies 13 Dec 96 (original)
16 Dec 02 (change 1)
ER 1130-2-520 040 CECW-OD Navigation and Dredging Operations and Maintenance Policies 29 Nov 96
ER 1130-2-530 020 CECW-OM Flood Control Operations and Maintenance Policies 30 Oct 96
ER 1130-2-540 031 CECW-O Environmental Stewardship Operations and Maintenance Policies 15 Nov 96 (Original)
04 Nov 02 (Change 1)
ER 1130-2-550 053 CECW-O Recreation Operations and Maintenance Policies 15 Nov 96 (original)
01 Oct 99 (change 1)
01 Mar 02 (change 2)
15 Aug 02 (change 3)
ER 1140-1-211 025 CECW-I Support for Others: Reimbursable Work 22 Jun 92
ER 1150-2-302 001 CECW-OM Annual Report on Local Cooperation Agreements (RCS: DAEN-CWO-44) 20 Mar 81
ER 1165-2-18 013 CECW-PR Reimbursement for Non-Federal Participation in Civil Works Projects 01 Feb 89
ER 1165-2-21 006 CECW-PR Flood Damage Reduction Measures in Urban Areas 30 Oct 80
ER 1165-2-25 021 CECW-PR Navigation Policy: Cost Apportionment of Bridge Alterations 30 May 79
ER 1165-2-26 010 CECW-PR Implementation of Executive Order 11988 on Flood Plain Management 30 Mar 84
ER 1165-2-27 004 CECW-PR Establishment of Wetlands Areas in Connection with Dredging 18 Aug 89
ER 1165-2-28 004 CECW-PR Corps of Engineers Participation in Improvements for Environmental Quality 30 Apr 80
ER 1165-2-29 015 CECW-PR General Credit for Flood Control 18 Nov 87
ER 1165-2-30 CH 1 22 CECW-AG Acceptance and Return of Required, Contributed, or Advanced Funds 31 Dec 97 (original)
30 Oct 98 (change 1)
ER 1165-2-111 002 CECW-PR Corps of Engineers Activities under the Small Reclamation Projects Act of 1956, as Amended 28 May 82
ER 1165-2-114 002 CECW-PR Use of Excess Power Revenues to Assist in Repayment of Irrigation Costs 25 Jun 64
ER 1165-2-117 004 CECW-PR Responsibility for Costs of Improved Standards in Highway and Housing Relocations 10 Jul 78
ER 1165-2-118 003 CECW-PR Federal Participation in Covered Flood Control Channels 13 Oct 78
ER 1165-2-119 008 CECW-PR Modifications to Completed Projects 20 Sep 82
ER 1165-2-120 025 CECW-PA Reimbursement for Advance Non-Federal Construction of Federally Authorized Harbor and Inland Harbor Improvements 15 Jun 88
ER 1165-2-121 009 CECW-PD Flood Control Cost-Sharing Requirements under the Ability-to-Pay Provision - Section 103(m) of PL 99-662 01 Nov 89
ER 1165-2-122 008 CECW-PA Studies of Harbor or Inland Harbor Projects by Non-Federal Interests 26 Aug 91
ER 1165-2-123 004 CECW-PR Single-Owner Situations 30 Oct 92
ER 1165-2-124 012 CECW-PA Construction of Harbor and Inland Harbor Projects by Non-Federal Interests 01 Oct 90
ER 1165-2-130 033 CECW-PR Federal Participation in Shore Protection 15 Jun 89
ER 1165-2-131 106 CECW-LN Local Cooperation Agreements for New Start Construction Projects 15 Apr 89
ER 1165-2-132 034 CECW-PO Hazardous, Toxic and Radioactive Waste (HTRW) Guidance for Civil Works Projects 26 Jun 92
ER 1165-2-400 024 CECW-PR Recreational Planning, Development, and Management Policies, CH 1 09 Aug 85
ER 1165-2-501 008 CECW-A Civil Works Ecosystem Restoration Policy 30 Sep 99
ER 1180-1-9 009 CEMP-EA/CECW-EP Design-Build Contracting 31 July 99

US Army Corps of Engineers Internet Publishing Group:
Point of Contact for this page:
E-mail address: pubs-corps@usace.army.mil

Additional points of contact for our Web readers

Page updated: 23 Jul 04


colored horizontal rule
[ USACE ]  [ Up to Publications [ Top of Page ]  [ Search ]  [ Help, POC List